Addison Creek Reservoir Project

Click on the first image to initiate a slide show of all images.

The Metropolitan Water Reclamation District of Greater Chicago’s (MWRD’s) Addison Creek Reservoir and Channel Improvement Projects will provide flood relief in Chicago’s western suburbs. These critical stormwater management projects will reduce flooding to approximately 2,200 structures along Addison Creek. The Addison Creek Reservoir will create a 600-acre-foot reservoir which includes a control structure, inlet structure, spillway, and pumping station.

Construction for the Addison Creek Reservoir Project started in February 2019 and will be finished in June 2023.  The project is 98 percent complete with a current value of $81.3 million. The project experienced extensive delays related to unanticipated underground conditions and COVID-19 supply chain impacts. To actively manage the time impacts caused by these unpredictable changes, the contractor submitted bifurcated schedule updates throughout the construction process. This is the first MWRD construction project to use bifurcated schedule updates. Due to this successful implementation and the specified use of AACE Recommended Practice 29R-03 MIP 3.4, this project experienced a quick resolution of time without disputes.

Submitted by:
Lee Welsh, PE
Senior Civil Engineer
Metropolitan Water Reclamation District of Greater Chicago
Engineering Department/Construction Division

Additional linked resources:
https://mwrd.org/
http://addisoncreekreservoir.com/

AACE Member Projects

Open for Submissions

AACE members work on some really interesting projects! We invite you to share photos from projects you’ve worked on.

If you would like to participate, email up to seven photos to editor@aacei.org. Include a brief description of the project and list what your role was. Include the location, when it started, when it was or is projected to be completed, and any other details you would like to share. Showcase the exciting work you do!

Submit jpeg or tiff images as attachments in an email to editor@aacei.org. Please ensure that the photos are in focus and as high of a resolution as possible. Include a caption for each photo submitted with the names and role(s) of people shown (if applicable). Include your contact information (i.e., name, phone number and email). Include a statement in the email that you have authorization to submit the photos and project information for publication.

Rate this post

Click on a star to rate it!

Average rating 4.6 / 5. Vote count: 13

No votes so far! Be the first to rate this post.

Share

Leave a Comment

Your email address will not be published. Required fields are marked *