Comments for Source https://source.aacei.org Source Fri, 05 Apr 2024 13:42:13 +0000 hourly 1 https://wordpress.org/?v=6.5.2 Comment on CCP Exam Update: Retiring the Technical Paper by Valerie Smith https://source.aacei.org/2023/12/11/ccp-exam-update-retiring-the-technical-paper/#comment-971 Fri, 05 Apr 2024 13:42:13 +0000 https://source.aacei.org/?p=8965#comment-971 Hi, Swathi –

We are delayed in launching the new CCP format until late April/early May. Until then, we are accepting registrations with the technical paper. If you wish to take the CCP in the new format with the in-exam memo, you will have to wait until the launch.

I am happy to answer any other questions you may have. Please feel free to email me at vsmith@aacei.org.

Warm regards,
Valerie

]]>
Comment on CCP Exam Update: Retiring the Technical Paper by Swathi https://source.aacei.org/2023/12/11/ccp-exam-update-retiring-the-technical-paper/#comment-970 Fri, 05 Apr 2024 08:07:23 +0000 https://source.aacei.org/?p=8965#comment-970 Hi,
May I know if you are accepting the technical paper or until the update, you no longer accept the exam application? could you please advise?

]]>
Comment on New Member Profile: Marco Ciasullo by Dr. Paul D. Giammalvo https://source.aacei.org/2024/02/21/new-member-profile-marco-ciasullo/#comment-966 Mon, 01 Apr 2024 06:27:15 +0000 https://source.aacei.org/?p=9172#comment-966 Nice to meet you, Marco. Next time you are in Indonesia, take the time to connect with our company. We run about 4 -6 AACE training courses a year, and I suspect we are one of the largest COMPETENCY DEVELOPMENT trainers (as opposed to “Cram for the Exam” teachers) as we send about 60-70 people a year.

https://build-project-management-competency.com/ptmc-training-standards-and-specifications-individual/

I am a dual citizen- American & Sicilian.

]]>
Comment on Part 1 – Six Elements of Project Controls; The Basics by Inaki Uribe https://source.aacei.org/2021/08/31/part-1-six-elements-of-project-controls-the-basics/#comment-896 Wed, 21 Feb 2024 23:12:46 +0000 https://source.aacei.org/?p=3998#comment-896 Congratulations. This 6 elements of Project Controls are totally applicable nowdays. The 6 elements can be simplified in 4 PDCA (Plan, Do, Study, Act) or Deming wheel, Continuous Improvement cycle is a continuous loop of planning, doing, checking (or studying), and acting.

Plan–do–check–act is associated with W. Edwards Deming, who is considered by many to be the father of modern quality control; however, he used PDSA (Plan-Do-Study-Act) and referred to it as the “Shewhart cycle”. Later in Deming’s career, he modified PDCA to “Plan, Do, Study, Act” (PDSA) because he felt that “check” emphasized inspection over analysis. The PDSA cycle was used to create the model of know-how transfer process, and other models.

The concept of PDCA is based on the scientific method, as developed from the work of Francis Bacon (Novum Organum, 1620). The scientific method can be written as “hypothesis–experiment–evaluation” or as “plan–do–check”. Walter A. Shewhart described manufacture under “control”—under statistical control—as a three-step process of specification, production, and inspection.

“Extract from Wikipedia PDCA definition”

]]>
Comment on February 2024 President’s Message by Ian Koenig https://source.aacei.org/2024/02/01/february-2024-presidents-message/#comment-869 Fri, 09 Feb 2024 06:48:25 +0000 https://source.aacei.org/?p=9121#comment-869 When will AACE publish its financial performance for 2023?
For 2022, see https://projects.propublica.org/nonprofits/organizations/741675154/202313199349304046/full

]]>
Comment on CCP Exam Update: Retiring the Technical Paper by Valerie Smith https://source.aacei.org/2023/12/11/ccp-exam-update-retiring-the-technical-paper/#comment-856 Mon, 29 Jan 2024 13:44:49 +0000 https://source.aacei.org/?p=8965#comment-856 Hello, Kamal –

The last day we will be accepting CCP applications with the technical paper will be on February 29, 2024. All registrations after that will be in the new memo format.

Candidates who register on or before February 29, 2024, will receive the current exam format (no memo) throughout their 6-month registration period.

Please email us at certification@aacei.org if you have any other questions.

Warm regards,
Valerie

]]>
Comment on CCP Exam Update: Retiring the Technical Paper by Kamal https://source.aacei.org/2023/12/11/ccp-exam-update-retiring-the-technical-paper/#comment-854 Sun, 28 Jan 2024 18:34:37 +0000 https://source.aacei.org/?p=8965#comment-854 Hello everyone,

It is still unclear when the last date will be for sitting the exam using the current system for individuals whose technical paper has been approved.

Thank you

]]>
Comment on An Engineer, a Project Manager, a Professor, and a Claims Expert by محمود فرح https://source.aacei.org/2023/12/26/an-engineer-a-project-manager-a-professor-and-a-claims-expert/#comment-851 Sat, 27 Jan 2024 20:39:02 +0000 https://source.aacei.org/?p=8981#comment-851 بالتوفيق دكتوره رانيا

]]>
Comment on Part 1 – Six Elements of Project Controls; The Basics by Anonymous https://source.aacei.org/2021/08/31/part-1-six-elements-of-project-controls-the-basics/#comment-838 Tue, 23 Jan 2024 04:44:03 +0000 https://source.aacei.org/?p=3998#comment-838 In reply to Hussain.

Excellent, I am really satisfied.

]]>
Comment on An Engineer, a Project Manager, a Professor, and a Claims Expert by Ahmed Salem https://source.aacei.org/2023/12/26/an-engineer-a-project-manager-a-professor-and-a-claims-expert/#comment-829 Fri, 19 Jan 2024 21:40:33 +0000 https://source.aacei.org/?p=8981#comment-829 As a colleague working with her; I am proud and it is an honor to work with her in any project.
She is very supportive and give confidence to any one working with her.

Greatest Dr. Rania

]]>